HL incident on 2010-12-05 — KS
Operator
Nustar Pipeline Operating Partnership L.p.
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2010-12-05 14:00
Report number
Location
KS
Narrative
On 12/5/10 at 13:00 a hunter notified nustar control center regarding an ammonia odor near valve 6-14. The pipeline was shutdown at 13:15. On 12/5/10 at 14:00 a nustar technician arrived on-site and confirmed that an ammonia odor was present. On 12/6/10 at 8:00 nustar resources arrived on-site to begin excavation of the stopple tee. On 12/6/10 at 14:00 nustar uncovered the leak site and was able to capture anhydrous ammonia drips in a 15 second interval and extrapolated that amount. Based on the field calculation it was determined the leak would exceed the reportable quantity. At 15:05 on 12/6/10, nustar contacted the nrc to make notification of a reportable leak incident. Anhydrous ammonia was leaking from a failed o-ring in a threaded fitting from the stopple tee. The repair was made by welding in the segment plugs.
Detailed record list
Report Received Date
2010-12-27 00:00:00
Iyear
2010
Report Number
20100313
Supplemental Number
15481
Report Type
Supplemental Final
Operator Id
10012
Name
Nustar Pipeline Operating Partnership L.p.
Operator Street Address
7340 W. 21st Street N, Suite 200
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67205
Local Datetime
2010-12-05 13:00:00
Location Latitude
41.51718
Location Longitude
-92.00372
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Anhydrous Ammonia
Unintentional Release Bbls
0.98
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2010-12-05 14:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-12-05 13:15:00
Restart Datetime
2010-12-07 11:00:00
On Site Datetime
2010-12-06 08:00:00
Nrc Rpt Datetime
2010-12-06 15:05:00
Nrc Rpt Num
961557
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Nustar Pipeline Operating Partnership L.p.
Segment Name
Washington To El Dora 8 Inch
Onshore State Abbreviation
Ia
Onshore Postal Code
52316
Onshore City Name
North English
Onshore County Name
Iowa
Designated Location
Milepost/valve Station
Designated Name
84.47
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.)
Release Type
Leak
Leak Type
Seal Or Packing
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
66
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
1800
Est Cost Other
0
Prpty
1866
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Preparer Name
D***** J* T******
Preparer Title
Director - Hse
Preparer Email
D**********@n***********.com
Preparer Telephone
316-721-7056
Preparer Fax
316-773-9001
Prepared Date
2010-12-27 00:00:00
Authorizer Name
G***** K*********
Authorizer Telephone
316-721-7052
Authorizer Title
Vice President General Manager
Authorizer Email
G**************@n***********.com
Narrative
On 12/5/10 at 13:00 a hunter notified nustar control center regarding an ammonia odor near valve 6-14. The pipeline was shutdown at 13:15. On 12/5/10 at 14:00 a nustar technician arrived on-site and confirmed that an ammonia odor was present. On 12/6/10 at 8:00 nustar resources arrived on-site to begin excavation of the stopple tee. On 12/6/10 at 14:00 nustar uncovered the leak site and was able to capture anhydrous ammonia drips in a 15 second interval and extrapolated that amount. Based on the field calculation it was determined the leak would exceed the reportable quantity. At 15:05 on 12/6/10, nustar contacted the nrc to make notification of a reportable leak incident. Anhydrous ammonia was leaking from a failed o-ring in a threaded fitting from the stopple tee. The repair was made by welding in the segment plugs.
| Report Received Date | 2010-12-27 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20100313 |
| Supplemental Number | 15481 |
| Report Type | Supplemental Final |
| Operator Id | 10012 PHMSA Enforcement |
| Name | Nustar Pipeline Operating Partnership L.p. |
| Operator Street Address | 7340 W. 21st Street N, Suite 200 |
| Operator City Name | Wichita |
| Operator State Abbreviation | KS |
| Operator Postal Code | 67205 |
| Local Datetime | 2010-12-05 13:00:00 |
| Location Latitude | 41.51718 Google Maps OpenStreetMap |
| Location Longitude | -92.00372 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Anhydrous Ammonia |
| Unintentional Release Bbls | 0.98 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2010-12-05 14:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2010-12-05 13:15:00 |
| Restart Datetime | 2010-12-07 11:00:00 |
| On Site Datetime | 2010-12-06 08:00:00 |
| Nrc Rpt Datetime | 2010-12-06 15:05:00 |
| Nrc Rpt Num | 961557 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Nustar Pipeline Operating Partnership L.p. |
| Segment Name | Washington To El Dora 8 Inch |
| Onshore State Abbreviation | Ia |
| Onshore Postal Code | 52316 |
| Onshore City Name | North English |
| Onshore County Name | Iowa |
| Designated Location | Milepost/valve Station |
| Designated Name | 84.47 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Pipe Facility Type | Interstate |
| Item Involved | Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.) |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 66 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 1800 |
| Est Cost Other | 0 |
| Prpty | 1866 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Preparer Name | D***** J* T****** |
| Preparer Title | Director - Hse |
| Preparer Email | D**********@n***********.com |
| Preparer Telephone | 316-721-7056 |
| Preparer Fax | 316-773-9001 |
| Prepared Date | 2010-12-27 00:00:00 |
| Authorizer Name | G***** K********* |
| Authorizer Telephone | 316-721-7052 |
| Authorizer Title | Vice President General Manager |
| Authorizer Email | G**************@n***********.com |
| Narrative | On 12/5/10 at 13:00 a hunter notified nustar control center regarding an ammonia odor near valve 6-14. The pipeline was shutdown at 13:15. On 12/5/10 at 14:00 a nustar technician arrived on-site and confirmed that an ammonia odor was present. On 12/6/10 at 8:00 nustar resources arrived on-site to begin excavation of the stopple tee. On 12/6/10 at 14:00 nustar uncovered the leak site and was able to capture anhydrous ammonia drips in a 15 second interval and extrapolated that amount. Based on the field calculation it was determined the leak would exceed the reportable quantity. At 15:05 on 12/6/10, nustar contacted the nrc to make notification of a reportable leak incident. Anhydrous ammonia was leaking from a failed o-ring in a threaded fitting from the stopple tee. The repair was made by welding in the segment plugs. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA