HL incident on 2010-12-09 — OK
Operator
Oneok Ngl Pipeline Lp
Cause
Notification Issue
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$61,000
Incident datetime
2010-12-09 17:50
Report number
Location
OK
Narrative
Farmer was deep ripping farm ground and ripping equipment struck and ruptured pipeline. Farmer had not made one-call notification prior to work. Depth of cover over pipeline was inspected at location of release and pipe was lowered to meet or exceed requirements of cfr 49 195.248.
Detailed record list
Report Received Date
2010-12-10 00:00:00
Iyear
2010
Report Number
20100291
Supplemental Number
20337
Report Type
Supplemental Final
Operator Id
32109
Name
Oneok Ngl Pipeline Lp
Operator Street Address
100 West Fifth Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2010-12-09 17:50:00
Location Latitude
37.742029
Location Longitude
-99.217775
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
3415
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2010-12-09 17:50:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-12-09 17:50:00
Restart Datetime
2010-12-11 17:00:00
On Site Datetime
2010-12-09 19:45:00
Nrc Rpt Datetime
2010-12-09 19:50:00
Nrc Rpt Num
961848
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
8
Pipe Fac Name
Oneok Jayhawk Pipeline 10251
Segment Name
Between Valves 52 And 53
Onshore State Abbreviation
Ks
Onshore Postal Code
67054
Onshore City Name
Greensburg
Onshore County Name
Edwards
Designated Location
Milepost/valve Station
Designated Name
170.6
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
20
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.156
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Bethlehem Steel
Pipe Coating Type
Coal Tar
Installation Year
1963
Manufactured Year
1963
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
2.5
Puncture Circum
4.5
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
155075
Est Cost Prop Damage
61000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
216075
Accident Psig
542
Mop Psig
1347
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
54873
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Third party that hit and ruptured pipeline called pipeline control center on emergency line and reported he had hit pipeline.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Landowner
Pipeline Easement Row Ind
Yes
Excavator Type
Farmer
Excavator Equipment
Farm Equipment
Work Performed
Agriculture
One Call Notified Ind
No
Locator Type
Utility Owner
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
47
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
N*** J****
Preparer Title
Dot Compliance Coordinator
Preparer Email
N*********@o****.com
Preparer Telephone
580-395-6304
Preparer Fax
580-395-2933
Prepared Date
2015-04-14 00:00:00
Authorizer Name
N*** J****
Authorizer Telephone
580-395-6304
Authorizer Title
Dot Compliance Coordinator
Authorizer Email
N*********@o****.com
Narrative
Farmer was deep ripping farm ground and ripping equipment struck and ruptured pipeline. Farmer had not made one-call notification prior to work. Depth of cover over pipeline was inspected at location of release and pipe was lowered to meet or exceed requirements of cfr 49 195.248.
| Report Received Date | 2010-12-10 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20100291 |
| Supplemental Number | 20337 |
| Report Type | Supplemental Final |
| Operator Id | 32109 PHMSA Enforcement |
| Name | Oneok Ngl Pipeline Lp |
| Operator Street Address | 100 West Fifth Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2010-12-09 17:50:00 |
| Location Latitude | 37.742029 Google Maps OpenStreetMap |
| Location Longitude | -99.217775 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
| Unintentional Release Bbls | 3415 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2010-12-09 17:50:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2010-12-09 17:50:00 |
| Restart Datetime | 2010-12-11 17:00:00 |
| On Site Datetime | 2010-12-09 19:45:00 |
| Nrc Rpt Datetime | 2010-12-09 19:50:00 |
| Nrc Rpt Num | 961848 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 8 |
| Pipe Fac Name | Oneok Jayhawk Pipeline 10251 |
| Segment Name | Between Valves 52 And 53 |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 67054 |
| Onshore City Name | Greensburg |
| Onshore County Name | Edwards |
| Designated Location | Milepost/valve Station |
| Designated Name | 170.6 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 20 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.156 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Bethlehem Steel |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1963 |
| Manufactured Year | 1963 |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 2.5 |
| Puncture Circum | 4.5 |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 155075 |
| Est Cost Prop Damage | 61000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 216075 |
| Accident Psig | 542 |
| Mop Psig | 1347 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 54873 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Third party that hit and ruptured pipeline called pipeline control center on emergency line and reported he had hit pipeline. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | No |
| Notify Cga Dirt | No |
| Private Row Ind | Yes |
| Private Subtype | Private Landowner |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Farmer |
| Excavator Equipment | Farm Equipment |
| Work Performed | Agriculture |
| One Call Notified Ind | No |
| Locator Type | Utility Owner |
| Visible Marks | No |
| Service Interruption | Yes |
| Service Interruption Hours | 47 |
| Root Cause Category | Notification Issue |
| Root Cause Type | No Notification Made To The One-Call Center/811 |
| Preparer Name | N*** J**** |
| Preparer Title | Dot Compliance Coordinator |
| Preparer Email | N*********@o****.com |
| Preparer Telephone | 580-395-6304 |
| Preparer Fax | 580-395-2933 |
| Prepared Date | 2015-04-14 00:00:00 |
| Authorizer Name | N*** J**** |
| Authorizer Telephone | 580-395-6304 |
| Authorizer Title | Dot Compliance Coordinator |
| Authorizer Email | N*********@o****.com |
| Narrative | Farmer was deep ripping farm ground and ripping equipment struck and ruptured pipeline. Farmer had not made one-call notification prior to work. Depth of cover over pipeline was inspected at location of release and pipe was lowered to meet or exceed requirements of cfr 49 195.248. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA