Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2010-08-09 — TX
Operator
Kinder Morgan Co2 Co. Lp
Cause
Other Accident Cause
Commodity
Co2 (Carbon Dioxide)
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2010-08-09 08:35
Report number
Location
TX
Narrative
On 8/9/2010 at 0835 hours on the val verde meter run located within mccamey station on the crc system, we suffered a temporary pressure surge from sandridge company (3rd party operator) during changes to their operating system. Relief valves within the sandridge facility opened and vented CO2, and our scada trending information supports that they overpressured our system for a very brief time. We vented CO2 for approximately 18 minutes. Volume of 815 scf. Or 0.37 bbls.
Detailed record list
Report Received Date
2010-09-02 00:00:00
Iyear
2010
Report Number
20100191
Supplemental Number
17825
Report Type
Supplemental Final
Operator Id
31555
Name
Kinder Morgan Co2 Co. Lp
Operator Street Address
1001 Louisana Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2010-08-09 08:35:00
Location Latitude
32.11581
Location Longitude
-102.29321
Commodity Released Type
Co2 (Carbon Dioxide)
Unintentional Release Bbls
0.37
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
1" Isolation Valve Closed Underneath Relief Valve
Ignite Ind
No
Explode Ind
No
Onshore State Abbreviation
Tx
Onshore Postal Code
79752
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Relief Valve
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Pressure Surge From Sandridge Pump Discharge
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
600
Est Cost Environmental
0
Est Cost Other
0
Prpty
600
Accident Psig
2160
Mop Psig
2025
Accident Pressure
Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Miscellaneous
Other Type
Miscellaneous
Misc Details
Pressure Spike From Sandridge Facility (3rd Party Operator)
Preparer Name
A**** Z*****
Preparer Title
Specialist- Regulatory Compliance
Preparer Email
A***********@k***********.com
Preparer Telephone
7133699512
Preparer Fax
3039843417
Prepared Date
2013-04-05 00:00:00
Authorizer Name
J*** J****
Authorizer Telephone
7133699721
Authorizer Title
Director- Operations And Engineering
Authorizer Email
J*********@k***********.com
Narrative
On 8/9/2010 at 0835 hours on the val verde meter run located within mccamey station on the crc system, we suffered a temporary pressure surge from sandridge company (3rd party operator) during changes to their operating system. Relief valves within the sandridge facility opened and vented CO2, and our scada trending information supports that they overpressured our system for a very brief time. We vented CO2 for approximately 18 minutes. Volume of 815 scf. Or 0.37 bbls.
| Report Received Date | 2010-09-02 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20100191 |
| Supplemental Number | 17825 |
| Report Type | Supplemental Final |
| Operator Id | 31555 PHMSA Enforcement |
| Name | Kinder Morgan Co2 Co. Lp |
| Operator Street Address | 1001 Louisana Suite 1000 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2010-08-09 08:35:00 |
| Location Latitude | 32.11581 Google Maps OpenStreetMap |
| Location Longitude | -102.29321 Google Maps OpenStreetMap |
| Commodity Released Type | Co2 (Carbon Dioxide) |
| Unintentional Release Bbls | 0.37 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | 1" Isolation Valve Closed Underneath Relief Valve |
| Ignite Ind | No |
| Explode Ind | No |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79752 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Relief Valve |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Pressure Surge From Sandridge Pump Discharge |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 600 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 600 |
| Accident Psig | 2160 |
| Mop Psig | 2025 |
| Accident Pressure | Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Accident Cause |
| Cause Details | Miscellaneous |
| Other Type | Miscellaneous |
| Misc Details | Pressure Spike From Sandridge Facility (3rd Party Operator) |
| Preparer Name | A**** Z***** |
| Preparer Title | Specialist- Regulatory Compliance |
| Preparer Email | A***********@k***********.com |
| Preparer Telephone | 7133699512 |
| Preparer Fax | 3039843417 |
| Prepared Date | 2013-04-05 00:00:00 |
| Authorizer Name | J*** J**** |
| Authorizer Telephone | 7133699721 |
| Authorizer Title | Director- Operations And Engineering |
| Authorizer Email | J*********@k***********.com |
| Narrative | On 8/9/2010 at 0835 hours on the val verde meter run located within mccamey station on the crc system, we suffered a temporary pressure surge from sandridge company (3rd party operator) during changes to their operating system. Relief valves within the sandridge facility opened and vented CO2, and our scada trending information supports that they overpressured our system for a very brief time. We vented CO2 for approximately 18 minutes. Volume of 815 scf. Or 0.37 bbls. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA