Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2010-07-29 — MT
Operator
Cenex Pipeline Llc
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$300
Incident datetime
2010-07-29 09:40
Report number
Location
MT
Narrative
No narrative available.
Detailed record list
Report Received Date
2010-08-26 00:00:00
Iyear
2010
Report Number
20100182
Supplemental Number
18318
Report Type
Supplemental Final
Operator Id
2170
Name
Cenex Pipeline Llc
Operator Street Address
803 Hwy 212 S (Po Box 909)
Operator City Name
Laurel
Operator State Abbreviation
MT
Operator Postal Code
59044
Local Datetime
2010-07-29 09:40:00
Location Latitude
45.792899
Location Longitude
-108.474178
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
0.3
Intentional Release Bbls
0
Recovered Bbls
0.27
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Billings Tank Farm
Onshore State Abbreviation
Mt
Onshore Postal Code
59102
Onshore City Name
Billings
Onshore County Name
Yellowstone
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Pipe Facility Type
Interstate
Item Involved
Instrumentation
Release Type
Leak
Leak Type
Seal Or Packing
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
23
Est Cost Prop Damage
300
Est Cost Emergency
0
Est Cost Environmental
200
Est Cost Other
0
Prpty
523
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Eq Additional Other Details
Failed Internal Seal On Pressure Indicator
Preparer Name
S**** M* S*****
Preparer Title
Ehs Manager
Preparer Email
M**********@c*****.com
Prepared Date
2013-07-29 00:00:00
Authorizer Name
J*** E* T******
Authorizer Telephone
406-628-5202
Authorizer Title
President
Authorizer Email
J***********@c*****.com
| Report Received Date | 2010-08-26 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20100182 |
| Supplemental Number | 18318 |
| Report Type | Supplemental Final |
| Operator Id | 2170 PHMSA Enforcement |
| Name | Cenex Pipeline Llc |
| Operator Street Address | 803 Hwy 212 S (Po Box 909) |
| Operator City Name | Laurel |
| Operator State Abbreviation | MT |
| Operator Postal Code | 59044 |
| Local Datetime | 2010-07-29 09:40:00 |
| Location Latitude | 45.792899 Google Maps OpenStreetMap |
| Location Longitude | -108.474178 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 0.3 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0.27 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Ignite Ind | No |
| Explode Ind | No |
| Pipe Fac Name | Billings Tank Farm |
| Onshore State Abbreviation | Mt |
| Onshore Postal Code | 59102 |
| Onshore City Name | Billings |
| Onshore County Name | Yellowstone |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Pipe Facility Type | Interstate |
| Item Involved | Instrumentation |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 23 |
| Est Cost Prop Damage | 300 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 200 |
| Est Cost Other | 0 |
| Prpty | 523 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Eq Additional Other Details | Failed Internal Seal On Pressure Indicator |
| Preparer Name | S**** M* S***** |
| Preparer Title | Ehs Manager |
| Preparer Email | M**********@c*****.com |
| Prepared Date | 2013-07-29 00:00:00 |
| Authorizer Name | J*** E* T****** |
| Authorizer Telephone | 406-628-5202 |
| Authorizer Title | President |
| Authorizer Email | J***********@c*****.com |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA