Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2010-06-12 — TX
Operator
Chevron Pipe Line Co
Cause
Other Outside Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$153,554
Incident datetime
2010-06-12 07:42
Report number
Location
TX
Narrative
Chevron pipe line (cpl) controller was notified of the spill saturday morning by the salt lake city fire department and cpl immediately shut down the pipeline. Cpl dispatched emergency response teams to manually close the valve upstream from the leak site and began containment response. Cpl notified all appropriate federal, state, and local emergency response agencies. Preliminary visual observations of the damaged pipeline appear consistent with damage caused by an electrical arc, and we are working with rocky mountain power company to develop a testing protocol to analyze the pipeline to help determine the cause of the accident.
Detailed record list
Report Received Date
2010-07-10 00:00:00
Iyear
2010
Report Number
20100146
Supplemental Number
20625
Report Type
Supplemental Final
Operator Id
2731
Name
Chevron Pipe Line Co
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2010-06-12 07:42:00
Location Latitude
40.76505
Location Longitude
-111.82493
Commodity Released Type
Crude Oil
Unintentional Release Bbls
800
Recovered Bbls
778
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Emergency Responder
Incident Identified Datetime
2010-06-12 07:42:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-06-12 07:42:00
Restart Datetime
2010-06-21 09:05:00
On Site Datetime
2010-06-12 09:05:00
Nrc Rpt Datetime
2010-06-12 09:54:00
Nrc Rpt Num
943773
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Red Butte Creek
Segment Name
Rangely To Salt Lake Crude System
Onshore State Abbreviation
Ut
Onshore Postal Code
84113
Onshore City Name
Salt Lake City
Onshore County Name
Salt Lake
Designated Location
Milepost/valve Station
Designated Name
174.7
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
32
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
X-42
Pipe Seam Type
Seamless
Pipe Manufacturer
National Tube
Pipe Coating Type
Other
Pipe Coating Details
Somastic
Installation Year
1952
Manufactured Year
1952
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Preliminary Visual Observations Of The Damaged Pipeline Appear Consistent With Damage Caused By An Electric Arc And We Are Working With Rocky Mountain Power Company To Develop A Testing Protocol To Analyze The Pipeline To Help Determine The Cause Of The Accident.
Wildlife Impact Ind
Yes
Fish Aquatic Impact Ind
Yes
Birds Impact Ind
Yes
Terrestrial Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Surface Water Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
10
Rel Water Name
5.b We Are Still Estimating The Amount Released In Or Reaching Water. 5.c Red Butte Creek, Liberty Pond, Jordan River
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
153554
Est Cost Emergency
18423499
Est Cost Environmental
13656687
Est Cost Other
0
Prpty
32233740
Accident Psig
64
Mop Psig
880
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
74659
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Electrical Arcing From Other Equipment Or Facility
Outside Force Type
Electrical Arcing From Other Equipment Or Facility
Preparer Name
G*** M* S****
Preparer Title
Dot Team Leader
Preparer Email
G********@c******.com
Preparer Telephone
713 432-3332
Preparer Fax
7134323477
Prepared Date
2015-07-27 00:00:00
Authorizer Name
G*** M* S****
Authorizer Telephone
713 432-3332
Authorizer Title
Dot Team Leader
Authorizer Email
G********@c******.com
Narrative
Chevron pipe line (cpl) controller was notified of the spill saturday morning by the salt lake city fire department and cpl immediately shut down the pipeline. Cpl dispatched emergency response teams to manually close the valve upstream from the leak site and began containment response. Cpl notified all appropriate federal, state, and local emergency response agencies. Preliminary visual observations of the damaged pipeline appear consistent with damage caused by an electrical arc, and we are working with rocky mountain power company to develop a testing protocol to analyze the pipeline to help determine the cause of the accident.
| Report Received Date | 2010-07-10 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20100146 |
| Supplemental Number | 20625 |
| Report Type | Supplemental Final |
| Operator Id | 2731 PHMSA Enforcement |
| Name | Chevron Pipe Line Co |
| Operator Street Address | 1400 Smith Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2010-06-12 07:42:00 |
| Location Latitude | 40.76505 Google Maps OpenStreetMap |
| Location Longitude | -111.82493 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 800 |
| Recovered Bbls | 778 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Emergency Responder |
| Incident Identified Datetime | 2010-06-12 07:42:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2010-06-12 07:42:00 |
| Restart Datetime | 2010-06-21 09:05:00 |
| On Site Datetime | 2010-06-12 09:05:00 |
| Nrc Rpt Datetime | 2010-06-12 09:54:00 |
| Nrc Rpt Num | 943773 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Red Butte Creek |
| Segment Name | Rangely To Salt Lake Crude System |
| Onshore State Abbreviation | Ut |
| Onshore Postal Code | 84113 |
| Onshore City Name | Salt Lake City |
| Onshore County Name | Salt Lake |
| Designated Location | Milepost/valve Station |
| Designated Name | 174.7 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 32 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.25 |
| Pipe Smys | 42000 |
| Pipe Specification | X-42 |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | National Tube |
| Pipe Coating Type | Other |
| Pipe Coating Details | Somastic |
| Installation Year | 1952 |
| Manufactured Year | 1952 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Preliminary Visual Observations Of The Damaged Pipeline Appear Consistent With Damage Caused By An Electric Arc And We Are Working With Rocky Mountain Power Company To Develop A Testing Protocol To Analyze The Pipeline To Help Determine The Cause Of The Accident. |
| Wildlife Impact Ind | Yes |
| Fish Aquatic Impact Ind | Yes |
| Birds Impact Ind | Yes |
| Terrestrial Impact Ind | Yes |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Surface Water Remed Ind | Yes |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 10 |
| Rel Water Name | 5.b We Are Still Estimating The Amount Released In Or Reaching Water. 5.c Red Butte Creek, Liberty Pond, Jordan River |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 153554 |
| Est Cost Emergency | 18423499 |
| Est Cost Environmental | 13656687 |
| Est Cost Other | 0 |
| Prpty | 32233740 |
| Accident Psig | 64 |
| Mop Psig | 880 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 74659 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Outside Force Damage |
| Cause Details | Electrical Arcing From Other Equipment Or Facility |
| Outside Force Type | Electrical Arcing From Other Equipment Or Facility |
| Preparer Name | G*** M* S**** |
| Preparer Title | Dot Team Leader |
| Preparer Email | G********@c******.com |
| Preparer Telephone | 713 432-3332 |
| Preparer Fax | 7134323477 |
| Prepared Date | 2015-07-27 00:00:00 |
| Authorizer Name | G*** M* S**** |
| Authorizer Telephone | 713 432-3332 |
| Authorizer Title | Dot Team Leader |
| Authorizer Email | G********@c******.com |
| Narrative | Chevron pipe line (cpl) controller was notified of the spill saturday morning by the salt lake city fire department and cpl immediately shut down the pipeline. Cpl dispatched emergency response teams to manually close the valve upstream from the leak site and began containment response. Cpl notified all appropriate federal, state, and local emergency response agencies. Preliminary visual observations of the damaged pipeline appear consistent with damage caused by an electrical arc, and we are working with rocky mountain power company to develop a testing protocol to analyze the pipeline to help determine the cause of the accident. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA