HL incident on 2010-06-08 — TX

Operator
Conocophillips
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$61,269
Incident datetime
2010-06-08 15:50
Report number
Location
TX
Narrative
At approximately 3:50pm on 6/8/2010, lcpl control room was notified of a leak within the refinery that may involve the 16" line from lcr to lcpl. The line was immediately shut down and pipeline emplyees were dispatched to the refinery to investigate. The crew verified that the source of the leak was the lcpl 16" line and began cleanup efforts with help from the refinery. Conclusion: the cracking found in the lc-01 pipeline was caused by fatigue cracking. The cracking was found next to the fillet weld on the bottom of the pipeline that welded the end to the pipe line. Fatigue cracking in the pipeline resulted from cyclical stresses in the piping. The cyclical stresses could be caused from a number of sources such as starts from the pumps, flow vibration, thermal gradients, poor support, etc. The exact source of the stresses could not be determined and would require further analysis/examination of the piping system. Going forward cop will do a surge analysis and will adjust it's operating procedures accordingly for this system.
Detailed record list
Report Received Date
2010-06-24 00:00:00
Iyear
2010
Report Number
20100123
Supplemental Number
15321
Report Type
Supplemental Final
Operator Id
Name
Conocophillips
Operator Street Address
600 North Dairy Ashford
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2010-06-08 15:50:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
3
Intentional Release Bbls
0
Recovered Bbls
2.99
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2010-06-08 15:50:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-06-08 15:50:00
Restart Datetime
2010-06-10 16:45:00
On Site Datetime
2010-06-08 16:20:00
Nrc Rpt Datetime
2010-06-08 16:15:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Lcpl 16 Inch Product Line
Segment Name
Lc01-0
Onshore State Abbreviation
La
Onshore Postal Code
70669
Onshore City Name
Westlake
Onshore County Name
Calcasieu Parish
Designated Location
Survey Station No.
Designated Name
38+87
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other
Weld Details
Repair Sleeve Weld
Installation Year
1988
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
Yes
Ocean Seawater Ind
Yes
Amount Released
0.71
Rel Water Name
Bayou Verdine
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Prop Damage
61269
Est Cost Emergency
15000
Prpty
76269
Accident Psig
547
Mop Psig
733
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
47074
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Crack found in fillet weld on the above ground portion of the pipeline
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related
Yes
Failure Subtype
Other
Fatigue Vibr Related Other
The Exact Source Could Not Be Determined
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2009
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2005
Hydrtst Most Rcnt Pressure
921
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Radiography Rcnt Year
2009
Exm Radiography Rcnt Ind
Yes
Preparer Name
T*** F****
Preparer Title
Dot Coordinator
Preparer Email
M***********@c*************.com
Preparer Telephone
806-318-9283
Preparer Fax
806-318-9286
Prepared Date
2010-10-05 00:00:00
Authorizer Name
T*** F****
Authorizer Telephone
806-318-9283
Authorizer Title
Dot Coordinator
Authorizer Email
M***********@c*************.com
Narrative
At approximately 3:50pm on 6/8/2010, lcpl control room was notified of a leak within the refinery that may involve the 16" line from lcr to lcpl. The line was immediately shut down and pipeline emplyees were dispatched to the refinery to investigate. The crew verified that the source of the leak was the lcpl 16" line and began cleanup efforts with help from the refinery. Conclusion: the cracking found in the lc-01 pipeline was caused by fatigue cracking. The cracking was found next to the fillet weld on the bottom of the pipeline that welded the end to the pipe line. Fatigue cracking in the pipeline resulted from cyclical stresses in the piping. The cyclical stresses could be caused from a number of sources such as starts from the pumps, flow vibration, thermal gradients, poor support, etc. The exact source of the stresses could not be determined and would require further analysis/examination of the piping system. Going forward cop will do a surge analysis and will adjust it's operating procedures accordingly for this system.
Report Received Date 2010-06-24 00:00:00
Iyear 2010
Report Number 20100123
Supplemental Number 15321
Report Type Supplemental Final
Operator Id 31684 PHMSA Enforcement
Name Conocophillips
Operator Street Address 600 North Dairy Ashford
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Local Datetime 2010-06-08 15:50:00
Location Latitude 30.239547 Google Maps OpenStreetMap
Location Longitude -93.277717 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 3
Intentional Release Bbls 0
Recovered Bbls 2.99
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2010-06-08 15:50:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2010-06-08 15:50:00
Restart Datetime 2010-06-10 16:45:00
On Site Datetime 2010-06-08 16:20:00
Nrc Rpt Datetime 2010-06-08 16:15:00
Nrc Rpt Num 943277 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Lcpl 16 Inch Product Line
Segment Name Lc01-0
Onshore State Abbreviation La
Onshore Postal Code 70669
Onshore City Name Westlake
Onshore County Name Calcasieu Parish
Designated Location Survey Station No.
Designated Name 38+87
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Weld Subtype Other
Weld Details Repair Sleeve Weld
Installation Year 1988
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind Yes
Ocean Seawater Ind Yes
Amount Released 0.71
Rel Water Name Bayou Verdine
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Prop Damage 61269
Est Cost Emergency 15000
Prpty 76269
Accident Psig 547
Mop Psig 733
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 47074
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Crack found in fillet weld on the above ground portion of the pipeline
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related Yes
Failure Subtype Other
Fatigue Vibr Related Other The Exact Source Could Not Be Determined
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2009
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2005
Hydrtst Most Rcnt Pressure 921
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Radiography Rcnt Year 2009
Exm Radiography Rcnt Ind Yes
Preparer Name T*** F****
Preparer Title Dot Coordinator
Preparer Email M***********@c*************.com
Preparer Telephone 806-318-9283
Preparer Fax 806-318-9286
Prepared Date 2010-10-05 00:00:00
Authorizer Name T*** F****
Authorizer Telephone 806-318-9283
Authorizer Title Dot Coordinator
Authorizer Email M***********@c*************.com
Narrative At approximately 3:50pm on 6/8/2010, lcpl control room was notified of a leak within the refinery that may involve the 16" line from lcr to lcpl. The line was immediately shut down and pipeline emplyees were dispatched to the refinery to investigate. The crew verified that the source of the leak was the lcpl 16" line and began cleanup efforts with help from the refinery. Conclusion: the cracking found in the lc-01 pipeline was caused by fatigue cracking. The cracking was found next to the fillet weld on the bottom of the pipeline that welded the end to the pipe line. Fatigue cracking in the pipeline resulted from cyclical stresses in the piping. The cyclical stresses could be caused from a number of sources such as starts from the pumps, flow vibration, thermal gradients, poor support, etc. The exact source of the stresses could not be determined and would require further analysis/examination of the piping system. Going forward cop will do a surge analysis and will adjust it's operating procedures accordingly for this system.