GD incident on 2010-04-07 — OK
Operator
Oklahoma Natural Gas Co
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$346,838
Incident datetime
2010-04-07 16:15
Report number
Location
OK, OKLAHOMA
Narrative
Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage.
Detailed record list
Occurred At
2010-04-07 16:15:00
Year
2010
Report Received Date
2010-05-05 00:00:00
Iyear
2010.0
Report Number
20100088.0
Supplemental Number
15143.0
Report Type
Supplemental Final
Operator Id
14210
Name
Oklahoma Natural Gas Co
Operator Street Address
401 N. Harvey Ave
Operator City Name
Oklahoma City
Operator State Abbreviation
OK
Operator Postal Code
73102
Local Datetime
2010-04-07 16:15:00
Location Street Address
S.w. 7th & Dewey
Location City Name
Oklahoma City
Location County Name
Oklahoma
Location State Abbreviation
OK
Location Postal Code
73109-5132
Location Latitude
35.45715
Location Longitude
-97.523294
Nrc Rpt Datetime
2010-04-07 22:00:00
Nrc Rpt Num
936448
Commodity Released Type
Natural Gas
Unintentional Release
4711.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
360.0
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Bored/drilled
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
2008.0
Pipe Diameter
12.0
Pipe Specification
Api-5l Gr A-53-B/x-42
Pipe Manufacturer
National Pipe Co
Material Involved
Steel
Steel Seam Type
Seamless
Steel Seam Type Details
Seamless
Wt Steel
0.375
Release Type
Mechanical Puncture
Puncture Axial
3.0
Puncture Circum
3.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
346838.0
Est Cost Emergency
5475.0
Est Cost Other
0.0
Est Cost Unintentional Release
32468.0
Prpty
384781.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
9.0
Accident Psig
48.0
Normal Psig
48.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This system is not monitored by control room facilities. This pipeline segment is a small portion of a larger distribution network within a city gate.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
Interstate Highway
Public Util Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Unknown/other
Work Performed
Road Work
One Call Notified Ind
Yes
One Call Ticket Num
1.00329e+13
One Call Center Name
Not Applicable
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
8.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
T**** R******
Preparer Title
Regulatory Specialist
Preparer Email
T************@o**.com
Preparer Telephone
405-551-6904
Authorizer Name
B**** B*******
Authorizer Title
Director Of Operations And Compliance
Authorizer Telephone
405-551-6653
Authorizer Email
B*************@o****.com
Narrative
Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage.
| Occurred At | 2010-04-07 16:15:00 |
|---|---|
| Year | 2010 |
| Report Received Date | 2010-05-05 00:00:00 |
| Iyear | 2010.0 |
| Report Number | 20100088.0 |
| Supplemental Number | 15143.0 |
| Report Type | Supplemental Final |
| Operator Id | 14210 PHMSA Enforcement |
| Name | Oklahoma Natural Gas Co |
| Operator Street Address | 401 N. Harvey Ave |
| Operator City Name | Oklahoma City |
| Operator State Abbreviation | OK |
| Operator Postal Code | 73102 |
| Local Datetime | 2010-04-07 16:15:00 |
| Location Street Address | S.w. 7th & Dewey |
| Location City Name | Oklahoma City |
| Location County Name | Oklahoma |
| Location State Abbreviation | OK |
| Location Postal Code | 73109-5132 |
| Location Latitude | 35.45715 Google Maps OpenStreetMap |
| Location Longitude | -97.523294 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2010-04-07 22:00:00 |
| Nrc Rpt Num | 936448 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 4711.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 360.0 |
| Crossing | Yes |
| Road Crossing Ind | Yes |
| Road Type | Bored/drilled |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 2008.0 |
| Pipe Diameter | 12.0 |
| Pipe Specification | Api-5l Gr A-53-B/x-42 |
| Pipe Manufacturer | National Pipe Co |
| Material Involved | Steel |
| Steel Seam Type | Seamless |
| Steel Seam Type Details | Seamless |
| Wt Steel | 0.375 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 3.0 |
| Puncture Circum | 3.0 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 346838.0 |
| Est Cost Emergency | 5475.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 32468.0 |
| Prpty | 384781.0 |
| Commercial Affected | 1.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 9.0 |
| Accident Psig | 48.0 |
| Normal Psig | 48.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | This system is not monitored by control room facilities. This pipeline segment is a small portion of a larger distribution network within a city gate. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | Yes |
| Public Row Ind | Yes |
| Public Subtype | Interstate Highway |
| Public Util Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Unknown/other |
| Work Performed | Road Work |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 1.00329e+13 |
| One Call Center Name | Not Applicable |
| Locator Type | Utility Owner |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 8.0 |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Excavator Failed To Maintain Clearance After Verifying Marks |
| Preparer Name | T**** R****** |
| Preparer Title | Regulatory Specialist |
| Preparer Email | T************@o**.com |
| Preparer Telephone | 405-551-6904 |
| Authorizer Name | B**** B******* |
| Authorizer Title | Director Of Operations And Compliance |
| Authorizer Telephone | 405-551-6653 |
| Authorizer Email | B*************@o****.com |
| Narrative | Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage. |