GD incident on 2010-04-07 — OK

Operator
Oklahoma Natural Gas Co
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$346,838
Incident datetime
2010-04-07 16:15
Report number
Location
OK, OKLAHOMA
Narrative
Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage.
Detailed record list
Occurred At
2010-04-07 16:15:00
Year
2010
Report Received Date
2010-05-05 00:00:00
Iyear
2010.0
Report Number
20100088.0
Supplemental Number
15143.0
Report Type
Supplemental Final
Operator Id
Name
Oklahoma Natural Gas Co
Operator Street Address
401 N. Harvey Ave
Operator City Name
Oklahoma City
Operator State Abbreviation
OK
Operator Postal Code
73102
Local Datetime
2010-04-07 16:15:00
Location Street Address
S.w. 7th & Dewey
Location City Name
Oklahoma City
Location County Name
Oklahoma
Location State Abbreviation
OK
Location Postal Code
73109-5132
Location Latitude
Location Longitude
Nrc Rpt Datetime
2010-04-07 22:00:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
4711.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
360.0
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Bored/drilled
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
2008.0
Pipe Diameter
12.0
Pipe Specification
Api-5l Gr A-53-B/x-42
Pipe Manufacturer
National Pipe Co
Material Involved
Steel
Steel Seam Type
Seamless
Steel Seam Type Details
Seamless
Wt Steel
0.375
Release Type
Mechanical Puncture
Puncture Axial
3.0
Puncture Circum
3.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
346838.0
Est Cost Emergency
5475.0
Est Cost Other
0.0
Est Cost Unintentional Release
32468.0
Prpty
384781.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
9.0
Accident Psig
48.0
Normal Psig
48.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This system is not monitored by control room facilities. This pipeline segment is a small portion of a larger distribution network within a city gate.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
Interstate Highway
Public Util Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Unknown/other
Work Performed
Road Work
One Call Notified Ind
Yes
One Call Ticket Num
1.00329e+13
One Call Center Name
Not Applicable
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
8.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
T**** R******
Preparer Title
Regulatory Specialist
Preparer Email
T************@o**.com
Preparer Telephone
405-551-6904
Authorizer Name
B**** B*******
Authorizer Title
Director Of Operations And Compliance
Authorizer Telephone
405-551-6653
Authorizer Email
B*************@o****.com
Narrative
Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage.
Occurred At 2010-04-07 16:15:00
Year 2010
Report Received Date 2010-05-05 00:00:00
Iyear 2010.0
Report Number 20100088.0
Supplemental Number 15143.0
Report Type Supplemental Final
Operator Id 14210 PHMSA Enforcement
Name Oklahoma Natural Gas Co
Operator Street Address 401 N. Harvey Ave
Operator City Name Oklahoma City
Operator State Abbreviation OK
Operator Postal Code 73102
Local Datetime 2010-04-07 16:15:00
Location Street Address S.w. 7th & Dewey
Location City Name Oklahoma City
Location County Name Oklahoma
Location State Abbreviation OK
Location Postal Code 73109-5132
Location Latitude 35.45715 Google Maps OpenStreetMap
Location Longitude -97.523294 Google Maps OpenStreetMap
Nrc Rpt Datetime 2010-04-07 22:00:00
Nrc Rpt Num 936448 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 4711.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 360.0
Crossing Yes
Road Crossing Ind Yes
Road Type Bored/drilled
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 2008.0
Pipe Diameter 12.0
Pipe Specification Api-5l Gr A-53-B/x-42
Pipe Manufacturer National Pipe Co
Material Involved Steel
Steel Seam Type Seamless
Steel Seam Type Details Seamless
Wt Steel 0.375
Release Type Mechanical Puncture
Puncture Axial 3.0
Puncture Circum 3.0
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 346838.0
Est Cost Emergency 5475.0
Est Cost Other 0.0
Est Cost Unintentional Release 32468.0
Prpty 384781.0
Commercial Affected 1.0
Industrial Affected 0.0
Residences Affected 9.0
Accident Psig 48.0
Normal Psig 48.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details This system is not monitored by control room facilities. This pipeline segment is a small portion of a larger distribution network within a city gate.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt Yes
Public Row Ind Yes
Public Subtype Interstate Highway
Public Util Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Unknown/other
Work Performed Road Work
One Call Notified Ind Yes
One Call Ticket Num 1.00329e+13
One Call Center Name Not Applicable
Locator Type Utility Owner
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 8.0
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name T**** R******
Preparer Title Regulatory Specialist
Preparer Email T************@o**.com
Preparer Telephone 405-551-6904
Authorizer Name B**** B*******
Authorizer Title Director Of Operations And Compliance
Authorizer Telephone 405-551-6653
Authorizer Email B*************@o****.com
Narrative Additional report information to revise final permanent repair cost of operator's property damage and repairs. See revisions on page 2, part a, number 13 gave the time for the new line to be started back up. On page 5, part d, #2. In addition, the okie one call ticket number was corrected on page 11, part g3, #9. Contractor working on roadbed for the I-40 relocation project in oklahoma city drove a 12" I-beam into the ong 12" steel gas main, puncturing the pipeline. Line was approximately 30 feet deep at the point of the damage. The depth and the location made it too dangerous and impractical to excavate to attempt a repair of the existing pipeline. The puncture size of 3" is an estimate necessary due to the I-beam being on top of the pipe and not being able to expose the pipe for further evaluation at that, depth. The damaged 12" pipeline will remain out of service pending permit approval from oklahoma department of transportation (odot) and union pacific railroad to replace the pipeline in a new location by directional bore. During the initial emergency response, a 2" plastic lateral line tied to the damaged section was shut off. Approximately 100 feet of 2" plastic pipe was installed to restore service to the 10 customers affected by the outage.