Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2010-03-15 — TX
Operator
Atmos Energy Corporation - Mid-Tex
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$953
Incident datetime
2010-03-15 10:28
Report number
Location
TX, MCLENNAN
Narrative
Txdot had installed a 3" pvc pipe over atmos' main to get depth shot on the main. A car drove over the pvc pipe, shoving it down on top of a 2" poly tee causing it to crack at socket fushion.
Detailed record list
Occurred At
2010-03-15 10:28:00
Year
2010
Report Received Date
2010-04-27 00:00:00
Iyear
2010.0
Report Number
20100068.0
Supplemental Number
15093.0
Report Type
Original
Operator Id
31348
Name
Atmos Energy Corporation - Mid-Tex
Operator Street Address
5420 Lbj Freeway, Suite 1800
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75240
Local Datetime
2010-03-15 10:28:00
Location Street Address
104 E Elm Dr
Location City Name
Elm Mott
Location County Name
Mclennan
Location State Abbreviation
TX
Location Postal Code
76640-9761
Location Latitude
31.67165
Location Longitude
-97.10032
Nrc Rpt Datetime
2010-03-15 12:55:00
Nrc Rpt Num
934009
Commodity Released Type
Natural Gas
Unintentional Release
1363.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
150.0
Incident Identified Datetime
2010-03-15 10:28:00
On Site Datetime
2010-03-15 11:00:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
32.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1977.0
Pipe Diameter
0.2
Pipe Specification
Astm D2513
Pipe Manufacturer
Driscoll
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Wt Plastic
0.216
Material Pe Pipe Code
2406
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 3 Location
Est Cost Prop Damage
953.0
Est Cost Unintentional Release
119.0
Prpty
1072.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
10.0
Normal Psig
10.0
Mop Psig
45.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype
Third Party
Preparer Name
H**** J**** F*****
Preparer Title
Operations Supervisor
Preparer Email
H***********@a**********.com
Preparer Telephone
2542242797
Authorizer Name
M*** C******
Authorizer Title
Compliance Director
Authorizer Telephone
2142062875
Authorizer Email
M*************@a**********.com
Narrative
Txdot had installed a 3" pvc pipe over atmos' main to get depth shot on the main. A car drove over the pvc pipe, shoving it down on top of a 2" poly tee causing it to crack at socket fushion.
| Occurred At | 2010-03-15 10:28:00 |
|---|---|
| Year | 2010 |
| Report Received Date | 2010-04-27 00:00:00 |
| Iyear | 2010.0 |
| Report Number | 20100068.0 |
| Supplemental Number | 15093.0 |
| Report Type | Original |
| Operator Id | 31348 PHMSA Enforcement |
| Name | Atmos Energy Corporation - Mid-Tex |
| Operator Street Address | 5420 Lbj Freeway, Suite 1800 |
| Operator City Name | Dallas |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75240 |
| Local Datetime | 2010-03-15 10:28:00 |
| Location Street Address | 104 E Elm Dr |
| Location City Name | Elm Mott |
| Location County Name | Mclennan |
| Location State Abbreviation | TX |
| Location Postal Code | 76640-9761 |
| Location Latitude | 31.67165 Google Maps OpenStreetMap |
| Location Longitude | -97.10032 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2010-03-15 12:55:00 |
| Nrc Rpt Num | 934009 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 1363.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 150.0 |
| Incident Identified Datetime | 2010-03-15 10:28:00 |
| On Site Datetime | 2010-03-15 11:00:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 32.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 1977.0 |
| Pipe Diameter | 0.2 |
| Pipe Specification | Astm D2513 |
| Pipe Manufacturer | Driscoll |
| Material Involved | Plastic |
| Plastic Type | Polyethylene (Pe) |
| Wt Plastic | 0.216 |
| Material Pe Pipe Code | 2406 |
| Release Type | Leak |
| Leak Type | Crack |
| Class Location Type | Class 3 Location |
| Est Cost Prop Damage | 953.0 |
| Est Cost Unintentional Release | 119.0 |
| Prpty | 1072.0 |
| Commercial Affected | 1.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 10.0 |
| Normal Psig | 10.0 |
| Mop Psig | 45.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Public |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Outside Force Damage |
| Cause Details | Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation |
| Outside Force Type | Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation |
| Vehicle Subtype | Third Party |
| Preparer Name | H**** J**** F***** |
| Preparer Title | Operations Supervisor |
| Preparer Email | H***********@a**********.com |
| Preparer Telephone | 2542242797 |
| Authorizer Name | M*** C****** |
| Authorizer Title | Compliance Director |
| Authorizer Telephone | 2142062875 |
| Authorizer Email | M*************@a**********.com |
| Narrative | Txdot had installed a 3" pvc pipe over atmos' main to get depth shot on the main. A car drove over the pvc pipe, shoving it down on top of a 2" poly tee causing it to crack at socket fushion. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA