GD incident on 2010-06-17 — MI

Operator
Consumers Energy Co
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$186,200
Incident datetime
2010-06-17 10:37
Report number
Location
MI
Narrative
On 6/17/2010 davis construction was driving sheet piling into ground at the south end of a bridge crossing the kawkawlin river, this bridge is part of the m-13 highway. During the installation of the sheet piling a 6" high pressure main was hit with the sheet piling causing the high pressure main to leak.
Detailed record list
Occurred At
2010-06-17 10:37:00
Year
2010
Report Received Date
2010-07-12 00:00:00
Iyear
2010.0
Report Number
20100047.0
Supplemental Number
15114.0
Report Type
Supplemental Final
Operator Id
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2010-06-17 10:37:00
Location Street Address
M-13 & Kawkawlin River (South Bridge Abutment)
Location City Name
Kawkawlin
Location State Abbreviation
MI
Location Postal Code
48631
Location Latitude
Location Longitude
Nrc Rpt Datetime
2010-06-18 09:45:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
500.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Incident Identified Datetime
2010-06-17 10:37:00
On Site Datetime
2010-06-17 11:10:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1959.0
Pipe Diameter
6.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.219
Release Type
Mechanical Puncture
Class Location Type
Class 2 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
186200.0
Est Cost Emergency
20000.0
Est Cost Unintentional Release
5000.0
Prpty
211200.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
385.0
Normal Psig
385.0
Mop Psig
400.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Incident was caused by third party
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
Davis Construction Was Driving Sheet Piling Into Ground At The South End Of A Bridge Crossing The Kawkawlin River, This Bridge Is Part Of The M-13 Highway. During The Installation Of The Sheet Piling A 6" High Preessure Main Was Hit With The Sheet Piling Causing The High Pressure Main To Leak.
Preparer Name
G*** F E****
Preparer Title
Regulatrory Services Engineer
Preparer Email
G*******@c******.net
Preparer Telephone
586-665-1142
Authorizer Name
D**** M M*******
Authorizer Title
Director Compliance Programs
Authorizer Telephone
517-788-0277
Authorizer Email
D*********@c********.com
Narrative
On 6/17/2010 davis construction was driving sheet piling into ground at the south end of a bridge crossing the kawkawlin river, this bridge is part of the m-13 highway. During the installation of the sheet piling a 6" high pressure main was hit with the sheet piling causing the high pressure main to leak.
Occurred At 2010-06-17 10:37:00
Year 2010
Report Received Date 2010-07-12 00:00:00
Iyear 2010.0
Report Number 20100047.0
Supplemental Number 15114.0
Report Type Supplemental Final
Operator Id 2748 PHMSA Enforcement
Name Consumers Energy Co
Operator Street Address One Energy Plaza
Operator City Name Jackson
Operator State Abbreviation MI
Operator Postal Code 49201
Local Datetime 2010-06-17 10:37:00
Location Street Address M-13 & Kawkawlin River (South Bridge Abutment)
Location City Name Kawkawlin
Location State Abbreviation MI
Location Postal Code 48631
Location Latitude 43.65361 Google Maps OpenStreetMap
Location Longitude -83.94444 Google Maps OpenStreetMap
Nrc Rpt Datetime 2010-06-18 09:45:00
Nrc Rpt Num 944519 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 500.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Incident Identified Datetime 2010-06-17 10:37:00
On Site Datetime 2010-06-17 11:10:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1959.0
Pipe Diameter 6.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Wt Steel 0.219
Release Type Mechanical Puncture
Class Location Type Class 2 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 186200.0
Est Cost Emergency 20000.0
Est Cost Unintentional Release 5000.0
Prpty 211200.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 385.0
Normal Psig 385.0
Mop Psig 400.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Incident was caused by third party
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Other Outside Force Damage
Outside Force Type Other Outside Force Damage
Osf Other Details Davis Construction Was Driving Sheet Piling Into Ground At The South End Of A Bridge Crossing The Kawkawlin River, This Bridge Is Part Of The M-13 Highway. During The Installation Of The Sheet Piling A 6" High Preessure Main Was Hit With The Sheet Piling Causing The High Pressure Main To Leak.
Preparer Name G*** F E****
Preparer Title Regulatrory Services Engineer
Preparer Email G*******@c******.net
Preparer Telephone 586-665-1142
Authorizer Name D**** M M*******
Authorizer Title Director Compliance Programs
Authorizer Telephone 517-788-0277
Authorizer Email D*********@c********.com
Narrative On 6/17/2010 davis construction was driving sheet piling into ground at the south end of a bridge crossing the kawkawlin river, this bridge is part of the m-13 highway. During the installation of the sheet piling a 6" high pressure main was hit with the sheet piling causing the high pressure main to leak.

All rights reserved. Copyright © by ClearPHMSA